Non-Compliance detail


  
Summary
 
Licence number: 601
Annual Return Start: 01 Jun 2013
Annual Return End: 31 May 2014
Date Received: 29 Jul 2014
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L2.1 Exceed 100%ile limit for TSS where water overflowed from MP11 on 15 days. Water mgt system at capacity due to rainfall event on or in days preceeding each occurrence. Additional samples collected. Settling pond lowered prior to forcast rain PRP to address non-compliance(s) being negotiated 15
L3.1 Exceed volume discharge limit on 7 days, where water overflowed from MP11. Water mgt system at capacity due to rainfall event on or in days preceeding each occurrence. Settling pond lowered prior to forcast rain PRP to address non-compliance(s) being negotiated 7
M2.1 Deposited dust guage DDG-09 (MP7) was unable to provide results on 2 occasions due to monitoring apparatus being stolen following breach of security fence. Apparatus replaced twice & since relocated. Location will continue to be regularly inspected Appropriate Action taken by licensee 2